Maintainer Umweltbundesamt GmbH / Publikationen
Maintainer Link https://www.umweltbundesamt.at/studien-reports
Maintainer Email publikationen@umweltbundesamt.at
Publisher Umweltbundesamt GmbH
Publisher Email opendata@umweltbundesamt.at
License CC0 1.0 Universell (CC0 1.0)
License Citation

Zitat: Mraz Gabriele, Becker Oda, Decker Kurt: NPP Borssele LTE Phase 1 Environmental Impact Assessment. Expert Statement. Wien, 2024 Reports, Band 0931 ISBN: 978-3-99004-776-7 105 S.

Geographic Toponym Niederlande
Update Frequency nach Bedarf
Lineage Quality Bericht
Schema Name OGD Austria Metadata 2.4
Schema Language eng
Schema Characterset utf8
Resource title and description in English NPP Borssele LTE Phase 1 Environmental Impact Assessment. Expert Statement. The Borssele NPP consists of one reactor with a capacity of 1,366 MWth and 485 MWe. The NPP has been in operation since 1973, i.e. for over 50 years. Accord ing to Art. 15a of the Dutch Nuclear Energy Act, Borssele may continue to produce energy only until the end of 2033, which corresponds to a service life of 60 years. The operating life is now to be extended due to a political decision from 2021. This requires an amendment of the Nuclear Energy Act. An Environmental Impact Assessment (EIA) is being carried out for this amendment; a second EIA phase is also planned.
ID c4590f58-7f93-4d62-abaf-0e5ebc22f1f7
Human readable URL https://www.data.gv.at/katalog/en/dataset/nppborsseleltephase1environmentalimpactassessment